Concrete floor slab construction process includes erection of formwork placement of reinforcement pouring compacting and finishing concrete and lastly removal of formwork and curing of concrete slab.
Construction of roof and floor slab.
Concrete weighs a lot and the outside walls have to be capable of supporting the giant slab.
One of the most crucial step in building a flat concrete roof is to figure out the size of the concrete block you will need.
An extra floor was required to be constructed which involved converting the original roof slab to a floor slab thereby increasing the live load capacity to 3 kn m 2.
Suppose you are at first floor the floor you are resti.
Assemble and erect formwork for slab2.
As verbs the difference between roof and slab.
Before knowing the difference you should understand between floor slab and roof slab.
Prepare and place reinforcement for slab3.
The slab may be supported by walls or by reinforced concrete beams usually cast monolithically with the slab or by structural steel beams or by columns or by the ground.
Contents concrete floor slab construction process1.
Quality floor construction includes good subgrade compaction even thickness slabs low slump concrete straight bulkhead lines and control cuts spaced 24 to 30 times the slab thickness.
The term floor slab refers to the finished result but the ways of achieving it are numerous which means there are different types of floor slab construction.
The blocks come in several sizes but this guide will assume you are using a 16 3 4 inch wide concrete slab.
A concrete slab is a common structural element of modern buildings consisting of a flat horizontal surface made of cast concrete.
As nouns the difference between roof and slab is that roof is the cover at the top of a building while slab is archaic mud sludge or slab can be southern us slang a car that has been modified with equipment such as loudspeakers lights special paint hydraulics and any other accessories that add to the style of the vehicle.
Slabs are constructed to provide flat surfaces usually horizontal in building floors roofs bridges and other types of structures.
Of course a concrete roof requires more support than a typical wooden roof.
A slab is designed based on its usage and functionality.
Interior support beams can help but the construction works best when concrete walls floor and roof form a solid shell.
The design of the upper storey extension was a lightweight strut.
The construction of the original building consisted of a reinforced concrete frame with cast in situ trough floors.
Common mistakes in concrete floor slab construction can be avoided with proper base preparation mix design placement finishing and curing.
In civil engineer both have different meaning.
Types of floor slab.
Step 3 placing the steel joists.
The steel joists will provide a strong foundation for the flat concrete.