Emt electrical metallic tubing is required unless otherwise specified.
Conduit for solar panels.
Also without conduit the wires in your walls could heat up and start a fire.
In a solar power system without conduit your outdoor wires could get wet eventually corrode and your pv system would likely suffer extensive and expensive damage.
Solar and wind power as well as emerging technologies such as biomass and fuel cells are transforming california.
The nec national electric code requires solar wiring to be transitioned to conduit before leaving the array.
This installation is rather unique in that the panels had to be designed to fit across a tight space.
Courtesy power home solar.
Renewable energy is helping to power the state s economy reducing our state s reliance on imported energy sources and decreasing air pollution.
Notice the electrical conduit located on either side of the panel arrays.
Never use smaller conduit than what is spec d in your plans.
During construction add a 1 inch metal conduit from the photovoltaic array to the designated inverter location and add a second 1 inch metal conduit from the inverter location to the electrical service panel.
With arrays that can be linked together in larger blocks there will be even less conduit showing on your roof.
Installing conduit is necessary to protect your wires from all exterior or interior elements and vice versa.