However laying vinyl flooring over concrete requires a bit more preparation.
Concrete floor prep for lvt.
If your concrete subfloor was just poured you ll need to allow it to properly cure for a minimum of 60 days before your luxury vinyl flooring installation begins.
Determine how much flooring and materials will be needed.
To prep the floors for the luxury vinyl planks our guys used two products to fill the cracks and smooth the cement slab foundation one is a crack filler the other a cement based patching compound to ensure the floors were level and smooth.
Test the floor for moisture.
If you don t have all the tools or you want to be 100 sure you don t waste any material invite a friend over to help you.
The steps in this guide on how to install vinyl plank flooring on concrete are quite easy to follow.
Preparing a concrete subfloor for luxury vinyl flooring concrete is a common subfloor material and in general it s easy to prepare for a luxury vinyl flooring installation project.
Prepare the subfloor repair cracks and holes.
Floor preparation is a large part of lvt lvp installation and more critical than ever.
Remove any carpet or other flooring.
Multiply length times width of the room.
Tape a 3 foot square piece of scrap vinyl to the concrete with duct tape sealing the edges tight.
In fact floor prep can take greater than 70 of an installer s time on a project.
Leave the vinyl in place for 72 hours.
Lvt can be installed directly over concrete but the concrete must be at least six weeks old proven to be dry and free of powder and.
If your hygrometer reading is above 75 rh regardless of whether the floor is old or new it s imperative that you install a surface damp proof membrane dpm.
If you have a vinyl floor you may be able to install your flooring directly on top of it.
Use concrete filler or a similar floor patching compound to repair the damage.
Lvt will follow the profile of the existing subfloor so make sure you fill in seams low spots and large gaps with floor patch.
Inspect the floor and repair cracks pits holes or other uneven patches.
Lvt products must only be installed on subfloors with moisture levels below 75 relative humidity rh.
Add about 10 to that number to account for any possible mistakes and warped boards.
Also it is important to take time and prepare well before you start assembling.
All lvt lvp flooring shares the need for the substrate to be perfectly flat to perform properly.